Skip to main content

Field Services

Drone Progress Verification in Ghana

Property owners who want a clear aerial record of their site, construction progress, site layout or changes over time especially when managing a project remotely.

GH₵2,500fixed priceIntroductory price
5 daystypical turnaround

Pricing shown applies to residential, non-income-producing properties. Commercial, income-producing, mixed-use and larger-scale properties are quoted separately. Contact us for commercial pricing.

A separate check from the people doing the work, followed by Trustline review before delivery.

The decision this helps you make

Use it when
Property owners who want a clear aerial record of their site, construction progress, site layout or changes over time especially when managing a project remotely.
What's included
  • Drone visit to your site
  • High-resolution aerial photography
  • Aerial video footage of the site
  • Multiple views of buildings and surrounding areas
  • Visual documentation of current construction progress
  • Key site features and access areas captured from above
  • Before-and-after comparison when previous Trustline drone records are available
  • Date-recorded progress documentation
  • Professional review and organization of captured footage
You receive
  • High-resolution aerial photographs
  • Aerial video highlights
  • Overview images of the full site
  • Construction progress photo set
  • Dated visual record of the visit
  • Before-and-after progress comparison when available
  • Secure digital access to your drone media

How it works

  1. 1Tell us what decision or concern the check needs to address.
  2. 2A Trustline-reviewed professional attends the site and records the evidence required for this service.
  3. 3Trustline reviews the findings and delivers the written report, typically within 5 days.

What the work covers

Aerial photographs and video document visible construction progress at a point in time. This is not structural certification, a workmanship inspection, a completion certificate or proof that all work is visible from the air.

What to have ready

  • Previous progress report or aerial evidence (optional)
  • Project drawings or scope (optional)

Common questions

How much does drone progress verification cost in Ghana?

GH₵2,500 in Ghana. Each price is fixed and shown before you pay; there is no quote stage and no hourly billing. This is an introductory price while the service is new, and it will rise.

How long does it take?

5 days from payment to report in a typical case. Most of that is scheduling the site visit around the professional and anyone who has to let them in.

What do I receive at the end?

High-resolution aerial photographs Aerial video highlights Overview images of the full site Construction progress photo set Dated visual record of the visit Before-and-after progress comparison when available Secure digital access to your drone media

Do I have to be in Ghana?

No. A Trustline-reviewed professional attends the site for this service and reports the findings back to you.

What do you need from me?

What you want checked, and the location. Any documents you have are optional and help but are not required.

Trustline Builds vets professionals before assignment and reviews submitted findings before delivery. You do not need a managed build with us to request this service.

Other field services

Start with this service

No account needed to start. You will see the price and what we need before you pay.